Master Bathroom Remodel: Drywall Installed

IMG_0466

I’m a few weeks late on posting this. I really haven’t had the time to sit down and right a proper entry until now. The day that I never thought would come finally came, the dry wall is up in the master bath. There were times when I was demolishing the bathroom that I thought it would it would be a impossible task to finish it. It was such a mess and was going to cost so much money to put back together. This is a big milestone for me.

This was my first time installing drywall and I made a few mistakes. Apparently the top peice of drywall should go up first. I put the bottom peice up first which left me with a gap at the top. I also managed to to incorrectly measure every single protrusion through the wall and had to make all the holes in the drywall larger to adjust.

Next items to start working on are the flooring and the shower waterproofing. The Warmly Yours floor heating was very expenisve and cost me my budget for the next few months. The schluter kerdi product I plan to use for the shower stall will be pretty expensive so that purchase will have to wait. I will work with what I have but won’t be able to buy much therefore I don’t expect a lot of progress over the next month.

Advertisements

Master Bathroom Remodel: Plumbing Finished

It’s been almost two months since my last post on the master bathroom remodel progress. I had to wait for a special order shower head to arrive which took over a month. I also had to pay for the previous months remodel.

Shower connections

The special order bathroom fixtures I bought were very expensive. I can’t believe I spent so much on them. Non stock fixtures are simply not cheap and i really didn’t like the stock fixtures. I think i will be really happy with them once they are installed but I didn’t expect to pay that much for them.

Today a plumber friend came over and help me install the new shower and vanity plumbing. OK, really he did all the work. I have never done any copper soldering before so I wasn’t able to do this myself. Now that I see how it’s done it’s really not that hard and i think i could do it myself next time.

IMG_0453

The first thing which needed to be done was to replace the dual control shower controls with a single control and route the shower head from the west wall to the south wall. There wont be a regular shower head installed here, it will be a handheld shower with a slide bar. Therefore I thought it would be best to install it on a separate wall from the shower controls.

I decided to move the vanity from the north wall to the east wall. I think i can better utilize this small space and install an extra cabinet next to the sink by having the cabinet on the east wall. The connections points however were too far over to be hidden under the sink. The cold water outlet and the drain pipe both needed to be moved over several inches.

I can now start putting the walls back up. Before I do I will put some insulation in to act as sound dampening materials. I also ordered the electric radiant floor heating for both the master bath and bedroom. Warmly Yours is having a 15% off sale for order of $1500 or more which i took advantage of. It may take me a few more months to pay that off and start work on the bathroom again.

Master Bathroom Remodel: Electrical Nearly Complete

Recessed fixturesbroan exhaust fan

The two recessed lighting fixtures are installed. The fixture over the toilet is a Broan 744 Recessed fixture with exhaust Fan. It’s supposed to have a noise rating of 1.5 sones, which isn’t the quietest but not the loudest. It’s the quietest recessed fixture I could find. I’m done with all the attic work in this location so I put the ceiling back up hopefully I won’t change my mind about something and have to take it out again.

I still want to put in two electrical outlets, one for a heated towel rack and one to put in a cabinet (so I can put all my rechargeable stuff and hide it). I have to decide where I want to tie into the existing GFCI protected circuit.

I special ordered some bathroom fixtures from Lowes on Wednesday. I can’t believe how much I spent on them, but I just didn’t like the cheap in-stock stuff. Bathroom fixtures just simply are not cheap. They were supposed to call me on Thursday and let me know how long before they arrive and it’s Saturday and I haven’t heard anything back.

I’ve put together the base cabinets I bought from IKEA to figure out how to lay them out. I’ve drawn out several ideas but it’s hard to tell without actually seeing it.

Master Bathroom Remodel: Pocket Door Frame Complete

Pocket door frame install

It’s taken me a long time to complete what now seems pretty simple. I can finally call the pocket door kit install done. Instead of going with a prebuilt frame that can be had at Home Depot, I went with a Johnson Hardware Universal Pocket Door Frame Kit. One reason I didn’t go with the prebuilt frame is because it looks like it’s not something I could take into the house and install by myself. The Johnson kit comes in a box and in pieces which were easy to install by myself.

I’m not sure how much the Home Depot prebuilt kit is, but the Johnson Hardware kit was $60 through Ace Hardware’s online site.

Next up, the electrical

Master Bedroom And Bathroom Remodel Progress

I know what I said, that the sprinkler system is going to be my priority. Give me a break thought, the back yard is sitll pretty muddy and now full of weeds. I’m now sure that the sprinkler project will have to wait till next year.

IMG_7627.JPGIt’s on to indoor projects, the first of which is the master bedroom and bathroom. I had a demolition party scheduled for the end of August, where I invited some of my friends over to demolish the house. Surprisingly, most of them didn’t show up. Enough did to get most of the work done.

For the bedroom the goal was to take the closet from the neighboring bedroom to create a bigger overall closet. This was accomplished.For the bathroom the goal was to remove the framed in shower. Both of these were accomplished. After the demo was completed, with drywall and crap all over the place, is when I questioned what I have done. After two trips to the dump and probably 6 hours of clean up I’m not sure I did make the right decision.

The framed in shower was not usable. It had been leaking pretty badly for quite a while. The lower framing was rotted, the water had leaked into the bedroom and there was even plant roots growing about a foot up the interiors of the wall. One doesn’t expect mold in a dry state such as New Mexico, but there was plenty of mold in the walls.

Picture 15The next step is to plan for the rebuild. Since it’s a small room, 7 foot by 8 foot, I’d like to put in a corner whirlpool tub with a shower. I think I can get a 54 inch by 54 inch corner tub to fit. I also plan to put in a electric radiant floor heating. The plan here shown is from Warmly Yours.

Can anyone loan me a few thousand dollars?