Sprinkler Project Update

IMG_7495.JPGRemember that sprinkler project I took a while back, back in March as a matter of fact. I had planned to only take a few weeks to complete it. Here it is 4 months later and it’s still not done.

I did make some progress. I have the valve box installed, vaves installed and one of the two lines hooked up. All I need to do is install the 2nd line and leak test and I can burry everything.

OK, so I admit that general laziness has slowed the project. I’m also going to blame the weather. We’ve had so much rain that the 24 inch trench has filled up with water to the top. There hasn’t been that much time in between rains to let the ground dry up, and I don’t want be playing in the mud. Depending on how the weather cooperates I plan to make this a priority again.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s