OMG! I Actually Worked On The Master Bathroom

Last fall, I threatened that I would have the master bathroom completed by the end of the winter. Here it is spring and I did almost nothing to the bathroom. I have a variety of excuses that I wont go into now, however I did finally make some actual progress on it this weekend.

Before I can do anything I need to install the pocket door. Before I install the pocket door I need to relocate the wiring that exists on the wall where the door goes.

Original wiring location

The wiring consists of power in, a wire to the lights controlled by a switch and a power out to a outlet. The good news is the wiring was easy to move to the next wall, it was loose in the attic and there was plenty of room to move it. I thought I would leave the outlet unpowered for now, until I figured out how I was going to rewire everything, apparently the wire to the outlet is also hooked up to the living room.

Temporary wiring location

Now I have a problem that I need to wire that outlet back up, so i have Romex running along the other side of the bathroom along up to the switch. It looks pretty messy and dangerous in the pictures, I know. Trust me it’s safe and temporary.

I need to decide how to wire up a exhaust fan, will it go near the light switch or near the toilet? I also need to figure out if I’m going to use a fancy digital shower control. If so It will use the power from the outlet then I can wire it up properly.

Finally I can install the pocket door. I have the studs marked to cut down, but I’m waiting for some friends to come by and verify my measurements before I screw it all up. I will save the pocket door install for another post.

Share and Enjoy:
  • Print
  • Add to favorites
  • Facebook
  • Twitter
  • Yahoo! Buzz
  • Sphinn
  • del.icio.us
  • Mixx
  • Google Bookmarks
  • Digg
  • Fark
  • FriendFeed
  • HackerNews
  • LinkedIn
  • MySpace
  • Reddit
  • Slashdot
  • StumbleUpon
  • Suggest to Techmeme via Twitter
  • Technorati
  • Tumblr
  • Ghenghe

About Greg Smith

When Greg is not writing on his blog Greg In The Desert, he is working at his full time job at Intel Corporation in Rio Rancho, New Mexico. You can find him on the internet at Flickr or Twitter.
This entry was posted in Home Improvement And Automation, Master Bathroom Remodel and tagged , , , , , , , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Additional comments powered by BackType